Draft 16-01-2007

WBS 6.2 Buildings

Steel Framed Buildings

Procurement Package 6.2-1
"
Steel Framed Buildings"

ITER Cost 2001 for Sharing: 68,8 kIUA

Sharing: EU=100%

Fonction, Scope of Supply:

The ITER site is enclosed by two fence systems. The inner fence surrounds a high security area. All ITER buildings and structures except the cooling basins and structures, the laboratory office building, and the pulsed and steady state switchyards, are inside the high security area.

The scope of the present package is the design and construction of the following Steel Framed Buildings (volumes of reinforced concrete in bracket:

·        Personnel & access control

·        Magnet PS switching network

·        North magnet power conversion

·        South magnet power conversion

·        NBI power supply 3.3/6.6 kV power supply Cryoplant CB/PFC fabrication

·        Cryoplant CB/PFC fabrication Site services

The scope of work includes moreover all technological systems of the buildings including electrical distribution, HVAC, water and sewage, minor auxiliaries etc.

Steel Frame Building is including all the auxiliary systems that don’t require special structural all radiological protection features.

Description, Technologies :

The buildings are based on conventional fabrication technologies for large size industrial type building with steel frameworks  

Main EIDI Activities Codes

10100

BUILDING WORK

10200

ROADWORKS

10300

INSTALLATION AND SUPPLY OF PIPES

10400

ELECTRICAL INSTALLATION WORK

10500

SUPPLY & INSTALLATION OF HEATING AND AIR-CONDITIONING EQUIPMENT

10600

HOISTING GEAR

10700

WATER SUPPLY AND TREATMENT

20300

POWER CABLES, BUSBARS AND ACCESSORIES

21100

MISCELLANEOUS / ELECTRICAL ENGINEERING

101000

CIVIL  AND PLANT ENGINEERING – SERVICES AND CONSULTANCY